For various civil engineering projects like road work, irrigation canal project, tank survey, earth moving, etc, the calculation method used are different. Some of these methods were introduced before the invention of computers and are still being continued. This document discusses about the industry practices of various methods of volume calculation so that the users can finally choose the right one for their project.
Earthworks
Earthworks are engineering works
created through the moving and/or processing of massive
Cutting
Cutting is the process of
excavating earth material from a work location to achieve the desired
Filling
Filling is the process of moving
the excavated material or additional earth material to a work
Applications of
Earthwork
Typically, earthwork is done in
the following projects:
Road works
Railways
Irrigation project such as
canals and dams
Other common earthwork
applications are land grading to reconfigure the topography of
Trapezoidal Rule
(End Area)
In trapezoidal method, each
segment of the section is divided into various trapezoids and
Trapezoidal Area A = 1/2 X a X (b1+b2)
Trapezoidal area |
Triangle area A = a * b/2
Triangle Area |