A cavity wall or hollow wall is
the one which consists of two separate walls called leader or skins with a cavity or gap in
between them.The two leaves of a cavity wall
may be of equal thickness if it is a non load bearing.The internal leaf may be thicker
than the external leaf to meet the structural requirements.
|
cavity wall |
Cavity walls are often
constructed forgiving better thermal insulation to the building.It also prevents the dampness to
enter and act as sound insulation.The inner and outer skins should
not be less than 10cm each(half brick).
CONSTRUCTION
DETAILS OF CAVITY WALL:-
A cavity wall is constructed of
two leaves that is inner and outer with a hollow space in between them.The width of cavity varies from
50mm to 100mm and it stands vertically. The outer is generally of ½ brick thickness
and the inner wall may be of ½ of 1 brick thickness.The two portions of the wall are
connected by means of metal ties or specially prepared bonded bricks. The metal ties are
generally of wrought iron or mild steel and they are coated with tar or galvanizedso as to
have protection against rust.Where corrosion is heavy, the metal
ties of copper or bronze may be adopted. The metal ties are placed at a horizontal
distance of 900 mm and a vertical distance of 450 mm. The arrangement of ties is kept
staggered .The outer wall is generally
constructed in stretcher bond , but it may be constructed in the flemish bond or english
garden-wall bond or flemish garden-wall bond by using bats for headers.
As far as possible, there should
be no intimate contact between two leaves of the cavity wall.
Construction at
base:-
The cavity may be started from
the top of foundation concrete& the hollow space, up to a level of about 100mm to 300mm
below the damp-proofing course at plinth level, may be filled with plain cement concrete
of proportion 1:2:4.But, as the cavity below
damp-proof course does not serve any purpose ,the brickwork up to a level of 100mm to 300mm below the
damp-proofing course at plinth level may be constructed solidly.The increased thickness of wall
will also be helpful in supporting the load to be carried by the wall.
Construction at
opening:-
In the plan, the cavity is
discontinued at the opening such as doors, windows, etc. The jambs of openings for doors and windows
are constructed solid either in brickwork or with layers of slates or tiles.
If metal windows are provided,
specially prepared metal frames can be used for this purpose.An inclined flexible D.P.C is
provided to act as a bridge over the cavity. the D.P.C should be extend lengthwise beyond the frame
for a distance of about 150mm on either side.
Construction at
top:-
It is necessary to take adequate
steps at top to prevent the entry of dampness to the inside portion of the wall.The cavity may be constructed up
to the coping of the parapet wall or alternatively it may be closed at the bottom of the
parapet wall by a damp proofing course.In case of a pitched roof, the
tops of two portions are connected by solid brickwork to support the roof truss and damp-proofing
course is inserted immediately below this solid portion.
Ventilation:-
It is necessary to provide enough
ventilation to the hollow space of the cavity wall. This is achieved by providing openings at
top at bottom of the wall so that a free current of air is established. The openings are to
be fitted with gratings so that entry of rats and other varmintsto the hollow space is
prevented. Sometimes, the air bricks are used for this purpose.
Shape and slope
of ties:-
The metal ties which are used to
connect the outer and inner portions should be so shaped and placed that water from outer
portion does not pass along inner portions. They should thus be sloped away from the inner
portion.
Dropping of
mortar, bats etc.:-
During construction of a cavity
wall, it should be seen that mortar , bats, etc., do not fall in the hollow space. The presence of
such material in the hollow space seriously affects the working of a cavity wall. For
this purpose, a wooden strip of width slightly less than that of the hollow space, is supported on
ties and it is raised as the work proceeds. Also, some bricks at the bottom are left out and
bats, etc. Falling in the cavity are removed from these holes.When the work is completed, this
bottom portion is sealed by filling it with bricks. It also be seen that the vermins or
mosquitoes do not find access in the cavity.
Design:-
The outside portion of a cavity
wall should be treated only as a protecting skin and not as a member of a load bearing wall.
The inside portion should have sufficient thickness to carry safely the load coming on it.
GENERAL FEATURES
OF CAVITY WALLS:-
In case of brick cavity wall
,each is half brick thick .such wall is capable of taking load of two storyedof the domestic
type , if heavier loads are to be supported ,the thickness of inner leaf can be increased .The cavity wall should neither be
less then 40mm more for more than 100mm in width .The inner and outer skins are
adequately tied together by means of the special walls ties placed in suitable
arrangement , at the rate of at least ties to a square meter of wall area .The ties are staggered .ties must
be placed at 300mm vertical intervals at all angles and doors and windows jambs to
increase stability .
Since the cavity separates the
two leaves of the wall, to prevent moisture to enter , it is essential to provide a
vertical damp proof course at window and door reveals .The damp proof course should be
flexible.
PURPOSE FOR
PROVIDING A CAVITY WALL:-
PREVENTION OF DAMPNESS:-When
cavity wall construction is adopted there is considerable decrease in the
prevention of dampness from outside to inside of the building.
2.HEAT INSULATION:-The air in the
cavity acts as a non-conductor of heat and hence the uniform temperature is maintained
inside the building.
3.SOUND INSULATION:- The
considerable portion of external noise is not allowed to enter inside the building by adopting
cavity wall construction.
4.LOAD ON FOUNDATION:-Due to less
solid thickness of wall the loads on foundation are considerably reduced.
5. EFFLORESCENCE:-The
construction of cavity wall results in the reduction of nuisance of efflorescence to a great extent.
6.ECONOMICAL:-In addition to
above mentioned advantages, it is found that the construction cost of a cavity
wall is 20% less than the construction cost of a corresponding solid wall .
0 Comments
For more Information Please Comment